County: Kosciusko
Completion Date: Ongoing
Size: 1500' Grassed Waterway, 2890' Underground Outlet, 3 WASCOBs, 3 Grade Stabilzation Structure
Total Cost
40,589
Cost Share
30,799
Partners: The Watershed Foundation, Indiana DNR - Lake and River Enhancement Program, Kosciusko County Soil and Water Conservation District
76% Share
About this project
David Leiter installed 1500 feet of grassed waterway with 2890 feet of underground outlet to help with sediment and nutrient filtering. He has also installed 3 Water and Sediment Control Basins to help with gully erosion, along with 3 Grade Stabilization Structures to help with sediment and nutrient control as well. This project was in collaboration with the Kosciusko County Soil and Water Conservation District and The Watershed Foundation with funding through the Indiana DNR with the Lake and River Enhancement Program.