David Leiter Sediment Control

County: Kosciusko
Completion Date: Ongoing
Size: 1500' Grassed Waterway, 2890' Underground Outlet, 3 WASCOBs, 3 Grade Stabilzation Structure
Total Cost

40,589

Cost Share

30,799

Partners: The Watershed Foundation, Indiana DNR - Lake and River Enhancement Program, Kosciusko County Soil and Water Conservation District
76% Share

About this project

David Leiter installed 1500 feet of grassed waterway with 2890 feet of underground outlet to help with sediment and nutrient filtering.  He has also installed 3 Water and Sediment Control Basins to help with gully erosion, along with 3 Grade Stabilization Structures to help with sediment and nutrient control as well.   This project was in collaboration with the Kosciusko County Soil and Water Conservation District and The Watershed Foundation with funding through the Indiana DNR with the Lake and River Enhancement Program.

Gallery Image
Gallery Image Gallery Image Gallery Image Gallery Image Gallery Image Gallery Image

Project Type

  • Sediment Control
  • Filters/Grassed waterway

Project Stats

Sediment Reduction
192 Metric Tons
Phosphorus Reduction
202 LBS/Year
Nitrogen Reduction
402 LBS/Year